Suchergebnisse - "fully polynomial-time approximation scheme"

  1. 1

    Rescheduling on identical parallel machines with machine disruptions to minimize total completion time von Yin, Yunqiang, Cheng, T.C.E., Wang, Du-Juan

    ISSN: 0377-2217, 1872-6860
    Veröffentlicht: Amsterdam Elsevier B.V 01.08.2016
    Veröffentlicht in European journal of operational research (01.08.2016)
    “… to identical parallel machines that are subject to disruptions with the objective of minimizing the total completion time …”
    Volltext
    Journal Article
  2. 2

    Integrated pricing and production scheduling of multiple customized products with a common base product von Yue, Qing, Chen, Zhi-Long, Wan, Guohua

    ISSN: 2472-5854, 2472-5862
    Veröffentlicht: Taylor & Francis 02.12.2019
    Veröffentlicht in IISE transactions (02.12.2019)
    “… Make-To-Order (MTO) is a popular production strategy commonly used by manufacturers selling customized products. Dynamic pricing is a popular tactical tool …”
    Volltext
    Journal Article
  3. 3

    Approximation schemes for two-agent scheduling on parallel machines von Zhao, Kejun, Lu, Xiwen

    ISSN: 0304-3975, 1879-2294
    Veröffentlicht: Elsevier B.V 14.01.2013
    Veröffentlicht in Theoretical computer science (14.01.2013)
    “… Furthermore, we design the fully polynomial time approximation schemes for both problems, respectively …”
    Volltext
    Journal Article
  4. 4

    Efficient computation of evacuation routes on a three-dimensional geometric network von Tang, Huajun, Elalouf, Amir, Levner, Eugene, Cheng, T.C.E.

    ISSN: 0360-8352, 1879-0550
    Veröffentlicht: New York Elsevier Ltd 01.10.2014
    Veröffentlicht in Computers & industrial engineering (01.10.2014)
    “… •We formulate the stochastic routing problem as a non-linear routing problem subject to node-wise constraints …”
    Volltext
    Journal Article
  5. 5

    Provision-after-wait with preferences ordered by difference: Tighter complexity and better approximation von Kovalyov, Mikhail Y., Pesch, Erwin, Quilliot, Alain

    ISSN: 0377-2217, 1872-6860
    Veröffentlicht: Elsevier B.V 16.03.2021
    Veröffentlicht in European journal of operational research (16.03.2021)
    “… , such that the social welfare is maximized, subject to a limited budget. Chan et al. [ACM Trans. Econ. Comput. 5(2), (2017), Article 12, pp. 12:1–12:36] focus on a natural …”
    Volltext
    Journal Article
  6. 6

    Two-machine flow shop scheduling with a common due date to maximize total early work von Chen, Xin, Miao, Qian, Lin, Bertrand M.T., Sterna, Malgorzata, Blazewicz, Jacek

    ISSN: 0377-2217, 1872-6860
    Veröffentlicht: Elsevier B.V 16.07.2022
    Veröffentlicht in European journal of operational research (16.07.2022)
    “… •A fully polynomial time approximation scheme (FPTAS) is developed.•The approximation results work for the weighted model - if a specific constraint is satisfied …”
    Volltext
    Journal Article
  7. 7

    Two-Agent Single Machine Scheduling with Deteriorating Jobs and Rejection von Li, Dawei, Li, Ganggang, Cheng, Fangzheng

    ISSN: 1024-123X, 1563-5147
    Veröffentlicht: New York Hindawi 28.11.2022
    Veröffentlicht in Mathematical problems in engineering (28.11.2022)
    “… The objective is to minimize the sum of the completion time of the accepted A-jobs and total rejection penalty of the rejected A-jobs subject to an upper bound on the sum of the given objective …”
    Volltext
    Journal Article
  8. 8

    Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan von Li, Shisheng, Ng, C.T., Cheng, T.C.E., Yuan, Jinjiang

    ISSN: 0377-2217, 1872-6860
    Veröffentlicht: Amsterdam Elsevier B.V 01.05.2011
    Veröffentlicht in European journal of operational research (01.05.2011)
    “… We consider the problem of scheduling n deteriorating jobs with release dates on a single batching machine. Each job’s processing time is an increasing simple …”
    Volltext
    Journal Article
  9. 9

    Resource allocation in rooted trees subject to sum constraints and nonlinear cost functions von Halman, Nir, Wimer, Shmuel

    ISSN: 0020-0190, 1872-6119
    Veröffentlicht: Elsevier B.V 01.09.2021
    Veröffentlicht in Information processing letters (01.09.2021)
    “… •We show that when costs are arbitrary monotone nondecreasing functions, the problem becomes intractable, and design for it a fully polynomial time approximation scheme …”
    Volltext
    Journal Article
  10. 10

    Algorithms for Communication Scheduling in Data Gathering Network with Data Compression von Luo, Wenchang, Xu, Yao, Gu, Boyuan, Tong, Weitian, Goebel, Randy, Lin, Guohui

    ISSN: 0178-4617, 1432-0541
    Veröffentlicht: New York Springer US 01.11.2018
    Veröffentlicht in Algorithmica (01.11.2018)
    “… subject to a bounded data transmission completion time (a.k.a. makespan). A recent result confirms the NP-hardness for this problem, even in the special case …”
    Volltext
    Journal Article
  11. 11

    Computational performances of a simple interchange heuristic for a scheduling problem with an availability constraint von Moncel, Julien, Thiery, Jérémie, Waserhole, Ariel

    ISSN: 0360-8352, 1879-0550
    Veröffentlicht: New York Elsevier Ltd 01.01.2014
    Veröffentlicht in Computers & industrial engineering (01.01.2014)
    “… •We address a scheduling problem subject to an unavailability constraint.•We study an existing interchange heuristic to minimize the total-flow time …”
    Volltext
    Journal Article
  12. 12

    Near optimal bounded route association for drone-enabled rechargeable WSNs von Wu, Tao, Yang, Panlong, Dai, Haipeng, Li, Ping, Rao, Xunpeng

    ISSN: 1389-1286, 1872-7069
    Veröffentlicht: Amsterdam Elsevier B.V 09.11.2018
    Veröffentlicht in Computer networks (Amsterdam, Netherlands : 1999) (09.11.2018)
    “… We first formulate a bounded route association problem which is proven to be NP-hard. Then we cast it as maximizing a monotone submodular function subject to matroid constraints and devise an efficient and accessible algorithm with a 13α …”
    Volltext
    Journal Article
  13. 13

    Single-machine scheduling of multiple projects with controllable processing times von Geng, Zhichao, Yuan, Jinjiang

    ISSN: 0377-2217, 1872-6860
    Veröffentlicht: Elsevier B.V 01.08.2023
    Veröffentlicht in European journal of operational research (01.08.2023)
    “… •The single-machine multiple-project scheduling problems.•The processing times of jobs are controllable.•The processing cost of a project includes total …”
    Volltext
    Journal Article
  14. 14

    Approximation algorithms for drone delivery scheduling with a fixed number of drones von Jana, Saswata, Mandal, Partha Sarathi

    ISSN: 0304-3975
    Veröffentlicht: Elsevier B.V 12.04.2024
    Veröffentlicht in Theoretical computer science (12.04.2024)
    “… This paper proposes an optimal pseudo-polynomial algorithm and a fully polynomial time approximation scheme (FPTAS …”
    Volltext
    Journal Article
  15. 15

    Due date assignment and scheduling on a single machine with two competing agents von Wang, Du-Juan, Yin, Yunqiang, Cheng, Shuenn-Ren, Cheng, T.C.E., Wu, Chin-Chia

    ISSN: 0020-7543, 1366-588X
    Veröffentlicht: London Taylor & Francis 16.02.2016
    Veröffentlicht in International journal of production research (16.02.2016)
    “… (minimising the objective of one agent, subject to an upper bound on the objective of the other …”
    Volltext
    Journal Article
  16. 16

    Optimizing Two-Truck Platooning With Deadlines von Xu, Wenjie, Cui, Titing, Chen, Minghua

    ISSN: 1524-9050, 1558-0016
    Veröffentlicht: New York IEEE 01.01.2023
    “… We prove that the two-truck platooning problem is weakly NP-hard and admits a Fully Polynomial Time Approximation Scheme (FPTAS …”
    Volltext
    Journal Article
  17. 17

    Maximizing total early work in a distributed two‐machine flow‐shop von Dolgui, Alexandre, Kovalyov, Mikhail Y., Lin, Bertrand M. T.

    ISSN: 0894-069X, 1520-6750
    Veröffentlicht: Hoboken, USA John Wiley & Sons, Inc 01.12.2022
    Veröffentlicht in Naval research logistics (01.12.2022)
    “… ) running time dynamic programming algorithm was proposed and converted into an On4ε2$$ O\left(\frac{n^4}{\varepsilon^2}\right) $$ time fully polynomial time approximation scheme …”
    Volltext
    Journal Article
  18. 18

    Two-agent parallel-machine scheduling with rejection von Li, Dawei, Lu, Xiwen

    ISSN: 0304-3975, 1879-2294
    Veröffentlicht: Elsevier B.V 05.12.2017
    Veröffentlicht in Theoretical computer science (05.12.2017)
    “… The objective is to minimize the sum of the given objective function fA of the accepted A-jobs and the total rejection penalty of the rejected A-jobs subject to an upper bound on the sum of the given …”
    Volltext
    Journal Article
  19. 19

    Coordinated order scheduling and outsourcing on dedicated parallel machines von Ou, Jinwen, Li, Weidong, Zhong, Xueling

    ISSN: 0377-2217
    Veröffentlicht: Elsevier B.V 01.09.2025
    Veröffentlicht in European journal of operational research (01.09.2025)
    “… For each of the two problems when m is fixed, we present a quasi-linear-time FPTAS (fully polynomial time approximation scheme …”
    Volltext
    Journal Article
  20. 20

    Batch scheduling of simple linear deteriorating jobs on a single machine to minimize makespan von Ji, Min, Cheng, T.C.E.

    ISSN: 0377-2217, 1872-6860
    Veröffentlicht: Amsterdam Elsevier B.V 01.04.2010
    Veröffentlicht in European journal of operational research (01.04.2010)
    “… We consider a scheduling problem in which n jobs are to be processed on a single machine. The jobs are processed in batches and the processing time of each job …”
    Volltext
    Journal Article