Výsledky vyhľadávania - Priority-rule scheduling algorithm

  1. 1

    A priority-aware dynamic scheduling algorithm for ensuring data freshness in 5G networks Autor Kim, Beom-Su

    ISSN: 0167-739X
    Vydavateľské údaje: Elsevier B.V 01.02.2025
    Vydané v Future generation computer systems (01.02.2025)
    “…To ensure the freshness of information in wireless communication systems, a new performance metric named the age of information (AoI) is being adopted in the…”
    Získať plný text
    Journal Article
  2. 2

    A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling Autor Chtourou, Hédi, Haouari, Mohamed

    ISSN: 0360-8352, 1879-0550
    Vydavateľské údaje: New York Elsevier Ltd 01.08.2008
    Vydané v Computers & industrial engineering (01.08.2008)
    “… The first stage of the algorithm solves the RCPSP for minimizing the makespan only using a priority-rule-based heuristic, namely an enhanced multi-pass random-biased serial schedule generation scheme…”
    Získať plný text
    Journal Article
  3. 3

    Priority Rule-Based Construction Procedure Combined with Genetic Algorithm for Flexible Job-Shop Scheduling Problem Autor Yokoyama, Soichiro, Iizuka, Hiroyuki, Yamamoto, Masahito

    ISSN: 1343-0130, 1883-8014
    Vydavateľské údaje: 20.11.2015
    “…The heuristic method we propose solves the flexible job-shop scheduling problem (FJSP) using a solution construction procedure with priority rules…”
    Získať plný text
    Journal Article
  4. 4

    A priority rule-based scheduling algorithm for complex manufacturing system Autor Wenmin Miao, Zhongjun Li, Shukai Yuan

    ISBN: 1424459583, 9781424459582
    ISSN: 2157-9555
    Vydavateľské údaje: IEEE 01.08.2010
    “… A priority rule-based scheduling algorithm has been proposed in this paper. The scheduling objective of this algorithm is to minimize the makespan, while maximizing the utilization of machines as much as possible…”
    Získať plný text
    Konferenčný príspevok..
  5. 5

    Job shop scheduling for meeting due dates and minimizing overtime using genetic algorithm incorporating new priority rules Autor Mitsunobu YODA, Toru EGUCHI, Takeshi MURAYAMA

    ISSN: 1881-3054
    Vydavateľské údaje: The Japan Society of Mechanical Engineers 01.01.2014
    “… We have already proposed the method using genetic algorithm incorporating priority rule for this scheduling problem…”
    Získať plný text
    Journal Article
  6. 6

    A Two-Stage Algorithm Based on 12 Priority Rules for the Stochastic Distributed Resource-Constrained Multi-Project Scheduling Problem With Multi-Skilled Staff Autor Yu, Yining, Xu, Zhe, Zhao, Song

    ISSN: 2169-3536, 2169-3536
    Vydavateľské údaje: Piscataway IEEE 2023
    Vydané v IEEE access (2023)
    “… A two-stage algorithm with 12 priority rules (TSA-12PRs) is proposed, these 12 priority rules are composed of 4 activity priority rules and 3 resource priority rules…”
    Získať plný text
    Journal Article
  7. 7

    SCHEDULING OF DYNAMIC TASKS IN WIRELESS GRID COMPUTING USING OPTIMIZED FINAL STERNNESS PRIORITY RULE (OFSPR) ALGORITHM Autor Karthik, P Vijaya, Vasudevan, V

    ISSN: 2231-1963, 2231-1963
    Vydavateľské údaje: Bareilly I A E T Publishing Company 01.07.2013
    “… This paper proposes a novel scheduling strategies and dynamically schedules the tasks by using Optimized final Sternness Priority Rule (OFSPR…”
    Získať plný text
    Journal Article
  8. 8

    A hierarchical collaborative multi-agent deep reinforcement learning framework for distributed flexible job shop scheduling problems considering energy efficiency and dynamic disruption in IIoTs Autor Zhang, Zi-Qi, Fang, Ming-Huang, Qian, Bin, Hu, Rong, Chen, Wei

    ISSN: 1568-4946
    Vydavateľské údaje: Elsevier B.V 01.01.2026
    Vydané v Applied soft computing (01.01.2026)
    “…), real-time scheduling for the distributed flexible job shop problems (DFJSP) with dynamic disruptions and energy efficiency has attracted increasing interest…”
    Získať plný text
    Journal Article
  9. 9

    Hybrid genetic algorithm with priority rule-based reconstruction for flexible job-shop scheduling Autor Yokoyama, Soichiro, Iizuka, Hiroyuki, Yamamoto, Masahito

    Vydavateľské údaje: IEEE 01.12.2014
    “… The proposed method utilizes a solution improvement procedure with priority rules. This procedure is implemented on top of the efficient existing method for the FJSP which consists of genetic algorithm and local search method…”
    Získať plný text
    Konferenčný príspevok..
  10. 10

    Research on a multiobjective cooperative operation scheduling method for agricultural machinery across regions with time windows Autor Guo, Yaqian, Zhang, Fan, Chang, Shuhui, Li, Zheng, Li, Zikang

    ISSN: 0168-1699, 1872-7107
    Vydavateľské údaje: Elsevier B.V 01.09.2024
    “…•We introduce a tabu search strategy to balance the global and local search performance of the algorithm…”
    Získať plný text
    Journal Article
  11. 11

    Distributed multi-agent approach based on priority rules and genetic algorithm for tasks scheduling in multi-robot cells Autor Maoudj, Abderraouf, Bouzouia, Brahim, Hentout, Abdelfetah, Kouider, Ahmed, Toumi, Redouane

    Vydavateľské údaje: IEEE 01.10.2016
    “… It is related to tasks (products) scheduling, which requires the allocation of operations and their sequencing on the robots, while satisfying tasks and robots constraints…”
    Získať plný text
    Konferenčný príspevok..
  12. 12

    Genetic programming with local search to evolve priority rules for scheduling jobs on a machine with time-varying capacity Autor Gil-Gala, Francisco J., Sierra, María R., Mencía, Carlos, Varela, Ramiro

    ISSN: 2210-6502
    Vydavateľské údaje: Elsevier B.V 01.10.2021
    Vydané v Swarm and evolutionary computation (01.10.2021)
    “…•A compelling experimental study is performed across a new benchmark set of instances of the (1,Cap(t)∥∑Tmax) problem. Priority rules combined with schedule generation schemes are a usual approach to online scheduling…”
    Získať plný text
    Journal Article
  13. 13

    Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project Autor He, Lihua, Zhang, Lianying

    ISSN: 0160-5682, 1476-9360
    Vydavateľské údaje: London Palgrave Macmillan 01.08.2013
    “… Most of these rules adopted a unidirectional scheduling based on a static priority rule. In this paper, we propose a dynamic priority rule-based forward-backward heuristic algorithm (FBHA…”
    Získať plný text
    Journal Article
  14. 14

    Combining hyper-heuristics to evolve ensembles of priority rules for on-line scheduling Autor Gil-Gala, Francisco J., Sierra, María R., Mencía, Carlos, Varela, Ramiro

    ISSN: 1567-7818, 1572-9796
    Vydavateľské údaje: Dordrecht Springer Netherlands 01.12.2022
    Vydané v Natural computing (01.12.2022)
    “… In this paper, we propose a combination of Genetic Programming (GP) and Genetic Algorithm (GA) to obtain ensembles of priority rules to solve a scheduling problem, denoted…”
    Získať plný text
    Journal Article
  15. 15

    SG-PBFS: Shortest Gap-Priority Based Fair Scheduling technique for job scheduling in cloud environment Autor Murad, Saydul Akbar, Azmi, Zafril Rizal M., Muzahid, Abu Jafar Md, Bhuiyan, MD. Khairul Bashar, Saib, Md, Rahimi, Nick, Prottasha, Nusrat Jahan, Bairagi, Anupam Kumar

    ISSN: 0167-739X, 1872-7115
    Vydavateľské údaje: Elsevier B.V 01.01.2024
    Vydané v Future generation computer systems (01.01.2024)
    “… Firstly, a Priority-Based Fair Scheduling (PBFS) algorithm has been introduced to schedule…”
    Získať plný text
    Journal Article
  16. 16

    Operations scheduling in make-and-pack production: Schedule construction and GA-based priority-rule generation procedures Autor Baumann, Philipp, Trautmann, Norbert

    ISSN: 2157-3611
    Vydavateľské údaje: IEEE 01.12.2012
    “… The heuristic consists of a genetic algorithm for generating priority rules which are used to sort the operations to be scheduled…”
    Získať plný text
    Konferenčný príspevok..
  17. 17

    Heuristics for a Two-Stage Assembly-Type Flow Shop with Limited Waiting Time Constraints Autor Han, Jun-Hee, Lee, Ju-Yong

    ISSN: 2076-3417, 2076-3417
    Vydavateľské údaje: Basel MDPI AG 01.12.2021
    Vydané v Applied sciences (01.12.2021)
    “… As this problem is proved to be NP-hard, various heuristic algorithms (priority rule-based list scheduling, constructive heuristic, and metaheuristic…”
    Získať plný text
    Journal Article
  18. 18

    Priority Based Fair Scheduling: Enhancing Efficiency in Cloud Job Distribution Autor Murad, Saydul Akbar, Azmi, Zafril Rizal M, Brishti, Faria Jerin, Saib, Md, Bairagi, Anupam Kumar

    Vydavateľské údaje: IEEE 25.08.2023
    “… To overcome this challenge, numerous researchers have focused on improving existing Priority Rule (PR…”
    Získať plný text
    Konferenčný príspevok..
  19. 19

    Resource-constrained multi-project scheduling: Priority rule performance revisited Autor Browning, Tyson R., Yassine, Ali A.

    ISSN: 0925-5273, 1873-7579
    Vydavateľské údaje: Amsterdam Elsevier B.V 01.08.2010
    “… In this context, past research has reported conflicting results on the performance of activity priority rule heuristics and does not provide managers with clear guidance on which rule to use in various situations…”
    Získať plný text
    Journal Article
  20. 20

    A genetic programming learning approach to generate dispatching rules for flexible shop scheduling problems Autor Braune, Roland, Benda, Frank, Doerner, Karl F., Hartl, Richard F.

    ISSN: 0925-5273, 1873-7579
    Vydavateľské údaje: Elsevier B.V 01.01.2022
    “… Therefore, in a list-scheduling algorithm, the available jobs can be ranked using the tree-based priority rules generated using GP…”
    Získať plný text
    Journal Article