Embracing BIM in its totality: a Total BIM case study
Gespeichert in:
| Titel: | Embracing BIM in its totality: a Total BIM case study |
|---|---|
| Autoren: | Disney, Oliver, 1985, Roupé, Mattias, 1975, Johansson, Mikael, 1975, Leto, Alessio Domenico, 1988 |
| Quelle: | Total BIM - En förutsättning för digital tvilling av byggprojekt Digital Twin Cities Centre Smart and Sustainable Built Environment. 13(3):512-531 |
| Schlagwörter: | Building information modeling, Total BIM, Digitalization, BIM, BIM on-site |
| Beschreibung: | Purpose: Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM. Design/methodology/approach: Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation. Findings: The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership. Originality/value: A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process. |
| Dateibeschreibung: | electronic |
| Zugangs-URL: | https://research.chalmers.se/publication/532232 https://research.chalmers.se/publication/532210 https://research.chalmers.se/publication/532232/file/532232_Fulltext.pdf |
| Datenbank: | SwePub |
| Abstract: | Purpose: Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM. Design/methodology/approach: Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation. Findings: The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership. Originality/value: A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process. |
|---|---|
| ISSN: | 20466102 20466099 |
| DOI: | 10.1108/SASBE-06-2022-0124 |
Full Text Finder
Nájsť tento článok vo Web of Science