(14265940), J. G., (14265943), E. B., (14265946), J. B., (14265949), U. Z., & (14265952), A. E. K. (2022). The pursuit of high perfection in meeting technological requirements in construction companies—Stage two: Euphoria. https://doi.org/10.1371/journal.pone.0278847.g018
Chicago Style (17th ed.) Citation(14265940), Jarosław Górecki, Ewa Bojarowicz (14265943), Jadwiga Bizon-Górecka (14265946), Umer Zaman (14265949), and Abdullah Emre Keleş (14265952). The Pursuit of High Perfection in Meeting Technological Requirements in Construction Companies—Stage Two: Euphoria. 2022. https://doi.org/10.1371/journal.pone.0278847.g018.
MLA (9th ed.) Citation(14265940), Jarosław Górecki, et al. The Pursuit of High Perfection in Meeting Technological Requirements in Construction Companies—Stage Two: Euphoria. 2022. https://doi.org/10.1371/journal.pone.0278847.g018.