Search Results - (integer OR interier) programming model(整数规划模型)*

Refine Results
  1. 1

    Alternate Title: Multi-Objective Gate Assignment Optimization Model Considering Carbon Emissions.

    Authors: 闫萍 刘连治

    Source: Science Technology & Engineering. 2025, Vol. 25 Issue 12, p5229-5239. 11p.

  2. 2

    Alternate Title: Construction of water allocation model with multi-objective integer programming under inadequate irrigation.

    Authors: 宋 歌 陈玉珊 张 珊 et al.

    Source: Transactions of the Chinese Society of Agricultural Engineering. May2022, Vol. 38 Issue 9, p129-139. 11p.

  3. 3

    Alternate Title: Model of hazardous materials transportation scheduling with considering vehicle loading limit.

    Authors: 强永 牟瑞芳

    Source: Xitong Gongcheng Lilun yu Shijian (Systems Engineering Theory & Practice). jan2017, Vol. 37 Issue 1, p212-218. 7p.

  4. 4
  5. 5

    Alternate Title: Lagrangian relaxation based appointment scheduling model and algorithm.

    Authors: 陶继平 黄荣欢 梅枝煌 et al.

    Source: Xitong Gongcheng Lilun yu Shijian (Systems Engineering Theory & Practice). jun2016, Vol. 36 Issue 6, p1536-1543. 8p.

  6. 6

    Alternate Title: Multi-Objective Optimization and Simulation of Logistics Distribution Network Location under Uncertain Demand.

    Source: Science Technology & Engineering. 2024, Vol. 24 Issue 14, p5994-6002. 9p.

  7. 7

    Alternate Title: Research on Distributed Flexible Job-shop Scheduling Problem with Dynamic Arrival of Jobs.

    Source: Journal of Anhui University of Technology (Natural Science). Sep2024, Vol. 41 Issue 5, p573-582. 10p.

  8. 8
  9. 9

    Alternate Title: Research on track allocation method under heavy haul train group. (English)

    Authors: 王付军 刘鸿飞 崔莉 et al.

    Source: Journal of Railway Science & Engineering; Oct2025, Vol. 22 Issue 10, p4398-4411, 14p

    Geographic Terms: CHINA

  10. 10
  11. 11

    Alternate Title: Optimization for incorporative distribution of parking space considering additional emergency order in automotive ro-ro storage yard.

    Source: Xitong Gongcheng Lilun yu Shijian (Systems Engineering Theory & Practice). May2018, Vol. 38 Issue 5, p1249-1262. 14p.

  12. 12

    Alternate Title: Carrying capacity calculation of high-speed railway station considering uncertainty of operation succession. (English)

    Authors: 江雨星 田文哲 张春民 et al.

    Source: Journal of Railway Science & Engineering; May2025, Vol. 22 Issue 5, p1961-1973, 13p

  13. 13

    Alternate Title: Assembly Scheduling Optimization of Complex Electromechanical Products Considering Parallel Batch Processing.

    Authors: 邓凯博 汤 辉 谢乃明 et al.

    Source: Journal of Nanjing University of Aeronautics & Astronautics / Nanjing Hangkong Hangtian Daxue Xuebao. Jun2025, Vol. 57 Issue 3, p547-556. 10p.

  14. 14

    Alternate Title: Shared Berth Allocation Based on Elastic Demand and Dynamic Pricing.

    Source: Science Technology & Engineering. 2024, Vol. 24 Issue 10, p4329-4335. 7p.

  15. 15

    Alternate Title: Integrated optimization of train timetable and rolling stock circulation with flexible composition strategies for an urban rail transit line. (English)

    Authors: 宋展鹏 田小鹏 牛惠民 et al.

    Source: Journal of Railway Science & Engineering; Jul2025, Vol. 22 Issue 7, p2960-2972, 13p

  16. 16
  17. 17

    Alternate Title: Home Health Care Routing and Scheduling Problem with Double Service. (English)

    Source: Journal of Computer Engineering & Applications; Jul2025, Vol. 61 Issue 13, p358-367, 10p

  18. 18

    Alternate Title: Inventory Routing Problem of Refined Oil Secondary Distribution Considering Multi-vehicle and Soft Time Windows.

    Source: Science Technology & Engineering. 2022, Vol. 22 Issue 18, p8043-8049. 7p.

  19. 19
  20. 20