Search Results - "Iterated greedy algorithm"
-
1
Authors: et al.
Source: RIO. Repositorio Institucional Olavide
Universidad Pablo de Olavide (UPO)Subject Terms: Dominating set, edge-weight, Iterated greedy algorithm, Metaheuristic algorithm, dominating set, metaheuristic algorithm, Edge-weight, Computer science, Operations research, mathematical programming, iterated greedy algorithm
File Description: application/pdf; application/xml
Access URL: https://hdl.handle.net/10433/21817
-
2
Authors:
Source: Journal of Scheduling, 27 (6), 525–543
Subject Terms: Earth sciences, ddc:550, Machine scheduling, ddc:650, Iterated greedy algorithm, Customer order scheduling, Earliness–tardiness, Dedicated machines, Metaheuristics
File Description: application/pdf
-
3
Authors:
Source: Operations Research Perspectives, Vol 15, Iss , Pp 100362- (2025)
Subject Terms: Machine scheduling, Customer order scheduling, Iterated greedy algorithm, Metaheuristics, Flow shop, Mathematics, QA1-939
File Description: electronic resource
-
4
Authors:
Source: AIMS Mathematics, Vol 10, Iss 5, Pp 11488-11513 (2025)
Subject Terms: optimization, distributed permutation flowshop scheduling, flexible assembly, sequence-dependent setup times, makespan, two-stage iterated greedy algorithm, Mathematics, QA1-939
File Description: electronic resource
Relation: https://doaj.org/toc/2473-6988
-
5
Authors: et al.
Source: Complex System Modeling and Simulation, Vol 4, Iss 2, Pp 137-165 (2024)
Subject Terms: TA168, hybrid flow shop, delivery time windows, Electronic computers. Computer science, 0211 other engineering and technologies, 0202 electrical engineering, electronic engineering, information engineering, sequence-dependent setup time, QA75.5-76.95, 02 engineering and technology, group scheduling, iterated greedy algorithm, Systems engineering
-
6
Authors: et al.
Source: IEEE Access, Vol 12, Pp 63462-63476 (2024)
Subject Terms: 0209 industrial biotechnology, parallel machine scheduling problem, minimal makespan, 0211 other engineering and technologies, Printing manufacturing systems, color sequence comparison, Electrical engineering. Electronics. Nuclear engineering, 02 engineering and technology, iterated greedy algorithm, TK1-9971
-
7
Authors: et al.
Source: Complex System Modeling and Simulation, Vol 3, Iss 4, Pp 282-306 (2023)
-
8
Authors: et al.
Source: Mathematics, Vol 13, Iss 15, p 2401 (2025)
Subject Terms: hybrid flow-shop scheduling problem, iterated greedy algorithm, critical paths, neighborhood structure, rapid evaluation method, Mathematics, QA1-939
File Description: electronic resource
-
9
Authors: et al.
Source: Algorithms, Vol 17, Iss 10, p 431 (2024)
Subject Terms: post-disaster rescue, collaborative helicopter rescue routing problem, limited survival time, time windows, improved iterated greedy algorithm, Industrial engineering. Management engineering, T55.4-60.8, Electronic computers. Computer science, QA75.5-76.95
Relation: https://www.mdpi.com/1999-4893/17/10/431; https://doaj.org/toc/1999-4893; https://doaj.org/article/4222f376054e4a16b88cf93a49c15cd2
-
10
Authors:
Source: IEEE Access, Vol 9, Pp 45562-45586 (2021)
Subject Terms: chance constrained approach, 0211 other engineering and technologies, project scheduling with uncertainty and disruption, Electrical engineering. Electronics. Nuclear engineering, 02 engineering and technology, Scheduling real-life projects, iterated greedy algorithm, TK1-9971
Access URL: https://ieeexplore.ieee.org/ielx7/6287639/9312710/09369353.pdf
https://doaj.org/article/5d4fa9548271423c85174752f2ee3f57
https://doaj.org/article/5d4fa9548271423c85174752f2ee3f57
https://doi.org/10.1109/ACCESS.2021.3063766
https://dblp.uni-trier.de/db/journals/access/access9.html#RahmanCR21
https://ieeexplore.ieee.org/document/9369353/ -
11
Authors:
Source: Tehnički Vjesnik, Vol 30, Iss 4, Pp 1241-1252 (2023)
Tehnički vjesnik
Volume 30
Issue 4Subject Terms: 0502 economics and business, 05 social sciences, 0211 other engineering and technologies, re-entrant, 02 engineering and technology, TA1-2040, group processing, programming model, Engineering (General). Civil engineering (General), parallel machine scheduling, iterated greedy algorithm
File Description: application/pdf
-
12
Authors: et al.
Source: Heliyon, Vol 9, Iss 9, Pp e20133- (2023)
Subject Terms: Gene selection, Feature selection, Medical diagnosis, Iterated greedy algorithm, Black widow optimization, Metaheuristic hybridization, Science (General), Q1-390, Social sciences (General), H1-99
File Description: electronic resource
-
13
Authors: et al.
Source: Mathematics, Vol 11, Iss 3, p 581 (2023)
Subject Terms: blocking, iterated greedy algorithm, distributed flowshop scheduling, multi-factory collaborative strategy, makespan, Mathematics, QA1-939
Relation: https://www.mdpi.com/2227-7390/11/3/581; https://doaj.org/toc/2227-7390; https://doaj.org/article/a6f0f8959fdc4baf80a433db45464c20
-
14
Authors:
Source: Tehnički Vjesnik, Vol 30, Iss 4, Pp 1241-1252 (2023)
Subject Terms: group processing, iterated greedy algorithm, parallel machine scheduling, programming model, re-entrant, Engineering (General). Civil engineering (General), TA1-2040
-
15
Authors:
Contributors:
Subject Terms: Secuenciación, Multiproducto, Multietapas, Algoritmo Voraz Iterativo, Multi-Vecinda, Números Triangulares Difusos, Ingeniería Industrial -- Tesis y disertaciones académicas, Algoritmos, Optimización matemática, Scheduling, Multiproduct, Multistage, Iterated Greedy Algorithm, Multi-Neighborhood, Triangular Fuzzy Numbers
File Description: pdf; application/pdf
Relation: https://hdl.handle.net/11349/33583
Availability: https://hdl.handle.net/11349/33583
-
16
Authors: et al.
Source: Computers & Operations Research. 111:177-196
Subject Terms: Makespan, 0211 other engineering and technologies, 02 engineering and technology, Block Insertion Heuristic, Iterated Greedy Algorithm, Total Flow Time, Hybrid Flowshop Scheduling
File Description: application/pdf
Access URL: https://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/7374
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85068125455&doi=10.1016/j.cor.2019.06.009&partnerID=40&md5=fd1179c0ce0ebd38956c7850a73d912f
https://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/9771
https://hdl.handle.net/20.500.12713/532 -
17
Authors:
Source: Shanghai Jiaotong Daxue xuebao, Vol 54, Iss 12, Pp 1291-1299 (2020)
Subject Terms: production scheduling, sine optimization algorithm, no-idle flow-shop scheduling problem (nifsp), iterated greedy algorithm, makespan, intelligent optimization algorithm, local search, Engineering (General). Civil engineering (General), TA1-2040, Chemical engineering, TP155-156, Naval architecture. Shipbuilding. Marine engineering, VM1-989
File Description: electronic resource
-
18
Authors: et al.
Source: Faculty Publications
Subject Terms: Batch production process, iterated greedy algorithm (IGA), Petri net (PN), variable neighborhood descent (VND)
-
19
Authors:
Source: Faculty Publications
Subject Terms: Flow-shop scheduling problem (FSP), heuristic algorithm, iterated greedy algorithm (IGA), review, tutorial
-
20
Authors: et al.
Source: Faculty Publications
Subject Terms: Bilevel optimization, dandelion algorithm, deployment optimization, flight trajectory planning, iterated greedy algorithm, machine learning, UAV
Full Text Finder
Nájsť tento článok vo Web of Science